Vinci
- floors
- 27
- apartments
- 569
- units/floor
- 23
Topped out July 2026 · Handover Q2 2027
Fronting Le Van Luong in Nhon Duc, Nha Be — about 300 m from the planned Metro Line 10 station. 1,296 apartments across the Vinci, Mika and The Gali towers, 25 amenity clusters designed around Urban Wellness, delivered with a high-end fit-out.
Why Khai Hoan Prime
The planned Metro Line 10 station is about 300 m away — inside the walking radius that defines transit-oriented development. Line 10 is planned at 83.9 km, linking Thu Thiem with the south and the Can Gio corridor.
The 25 amenity clusters are grouped into four layers of wellbeing — physical, mental, social and sustainable — rather than presented as a long undifferentiated list.
The project topped out in July 2026 and has received clearance to sell future-formed housing. You can see the real building before committing.
Choose the standard schedule, the extended schedule, bank financing or accelerated payment. Financing covers up to 75% with 0% interest for 18 months and principal grace of up to 36 months.
Phu My Hung, GS Metro City, the Ben Luc – Long Thanh expressway and the Can Gio bridge are reshaping the whole Le Van Luong – Nguyen Huu Tho corridor.
Connectivity
Transit-oriented development places homes, workplaces and public amenities within a 400 – 800 m walk of a public transport station. Khai Hoan Prime sits roughly 300 m from the planned station — inside that core radius.
Metro Line 10 is planned at 83.9 km, linking Thu Thiem, the southern districts and the Can Gio direction.
Southern Saigon is where planned Metro Lines 4, 7 and 10 and the Ben Thanh – Can Gio line meet.
Within walking distance of a station, daily travel time and cost fall noticeably compared with depending entirely on a private vehicle.
Metro Line 10 details reflect published planning documents. Actual delivery is decided by the authorities and may change.
Location
From Khai Hoan Prime the Le Van Luong – Nguyen Huu Tho corridor leads to Phu My Hung, District 7 and the city centre, while the Ben Luc – Long Thanh expressway opens the route to Long Thanh and Vung Tau.
Le Van Luong Street frontage, Nhon Duc commune, Nha Be district, Ho Chi Minh City
Open in Google Maps
The idea
Rather than stacking amenities into one long list, Khai Hoan Prime groups its 25 clusters into four layers of wellbeing, so that something is genuinely useful every day of the week.
Daily movement in green space, clean air and open water.
Riverside calm, a library and rooftop gardens to reset in.
A 3,000 m² clubhouse and a chain of shared spaces that hold the community together.
A 21% building footprint, landscape-led architecture and durable materials.
Amenities
Everything sits inside the roughly 2-hectare site, from riverside ground level up to the sky gardens on floors 3A, 12A and 23.
Scale
Vinci faces Le Van Luong; Mika and The Gali step back towards the river. 1,296 apartments on a 19,730 m² site with two basement levels and a building footprint of just 21%.
Floor plans
Gross areas run from 45.55 m² (1BR + study) to 90.30 m² (3BR corner). Pick a tower and bedroom count to see the matching layouts — tap an image to enlarge.
24 / 24
Vinci
Vinci
Vinci
Vinci
Vinci
Vinci
Vinci
Vinci
Vinci
Vinci
Mika
Mika
Mika
Mika
Mika
Mika
Mika
Mika
The Gali
The Gali
The Gali
The Gali
The Gali
The Gali
No layout matches these filters. Try removing one.
As built
These are photographs of completed mock-up apartments on site, not renderings. The handover standard is a high-end fit-out: floors, ceilings, kitchen and bathroom fittings are installed.
The detailed materials schedule is attached to the sale-purchase contract.
Progress
The structure is complete and the topping-out ceremony took place in July 2026. The developer expects to finish and hand over apartments in Q2 2027.
Photographs are supplied by the developer with each progress update. Actual progress may change; inspect the site before each payment instalment.
View moreSales policy
The terms below are taken from Khai Hoan Land sales policy notice 04/2026 and early-booking incentive notice 05/2026.
Effective from 4 September 2026 until superseded
For the first 50 customers (booking numbers 01–50), calculated on the price before VAT and maintenance fund.
100% of the operating management fee is waived for the first 24 months from official handover.
Borrow up to 75% of the contract value including VAT at 0% interest for 18 months from first drawdown, with principal grace of up to 36 months and no early-repayment fee during the support period.
1% for 2–3 completed transactions; 2% from 4 units upwards.
Applies when the buyer signs the developer’s waiver of the future-housing bank guarantee letter.
Paying 70% earns an 8% discount; paying 95% earns 11%.
Choose a reference unit and enter a price to see each instalment. The calculator applies the ratios in the 4 September 2026 sales policy (VAT 10%, maintenance fund 2% of the price before VAT).
| Instalment | You pay | Bank disburses |
|---|
Results are indicative and rounded to the nearest thousand dong. The official price of each unit, tax and maintenance fund are set out in the sale-purchase contract.
Send me this calculation on WhatsAppLegal
Khai Hoan Prime is developed by Giao Huong Xanh Co., Ltd as investor, with Khai Hoan Land Group JSC as project developer and distributor.
Foreign individuals and organisations who qualify to own housing in Vietnam under the 2023 Housing Law may sign a sale-purchase contract at the project. A foreign individual needs a valid passport with a Vietnamese entry stamp and must not be entitled to diplomatic or consular privileges and immunities.
Ownership term: Vietnamese nationals hold long-term stable ownership; foreign nationals hold 50-year ownership under the law in force at handover.
The project has been cleared for sale to foreign buyers. The share of apartments a building may sell to foreigners is capped by law, so check the remaining quota when you reserve.
Q&A
The project fronts Le Van Luong Street in Nhon Duc commune, Nha Be district, Ho Chi Minh City — the gateway to the southern part of the city. According to the developer’s positioning documents it sits about 300 m from the planned Metro Line 10 station, inside the walking radius used to define transit-oriented development.
The investor is Giao Huong Xanh Co., Ltd. Khai Hoan Land Group JSC is the project developer and distributor. Because Khai Hoan Land has bought the entire inventory wholesale, buyers currently sign a transfer of the sale-purchase contract with Khai Hoan Land.
1,296 apartments across three towers: Vinci with 27 floors and 569 units, Mika with 25 floors and 360 units, and The Gali with 27 floors and 328 units. There are four families of layout — 1BR, 1BR+1, 2BR and 3BR — with gross areas from about 45.55 to 90.30 m².
The project topped out in July 2026 and handover is expected in Q2 2027 with a high-end fit-out. Floor-to-slab height is 2.95 m; kitchen and bathroom fittings are installed, with copper stub-outs for air conditioning in the living room and bedrooms.
Official prices are released by the developer phase by phase and unit by unit, and are not published openly. The developer’s September 2026 reference calculator uses an example of a 67.36 m² two-bedroom unit in the Vinci tower at VND 4.9 billion before VAT. Contact us for the price list and availability of the current phase.
The reservation amount is VND 50,000,000, transferred to the investor together with the standard booking form. The first 50 customers (booking numbers 01–50) receive a 3% discount on the price before VAT and maintenance fund. Refund and conversion terms follow the reservation agreement you sign — read it before transferring.
Military Commercial Joint Stock Bank (MB) provides the project guarantee, and MB — Saigon branch is the official lending partner. Buyers choosing the financing route receive 0% interest for 18 months from first drawdown and principal grace of up to 36 months.
Yes, if they qualify to own housing in Vietnam under the 2023 Housing Law. Foreign nationals hold 50-year ownership while Vietnamese nationals hold long-term stable ownership. Because the foreign quota in each building is capped, check the remaining allocation when you reserve.
The operating management fee is VND 17,600/m²/month, fully waived for the first 24 months from official handover. Car parking is not included in that fee — owners may buy or rent a car parking space.
Yes. Khai Hoan Land’s apartment project fronting Le Van Luong in Nhon Duc, Nha Be was previously introduced as La Partenza; the current commercial name in the developer’s file is Khai Hoan Prime. If you see both names, they refer to the same development.
Contact
Happy Land is a distribution agent. We send the price list for the phase currently open, the units still available by floor and orientation, and we work out the payment schedule that suits you.
1578 Lê Văn Lương, xã Hiệp Phước, TP. Hồ Chí Minh
Browse more apartment projects in southern Ho Chi Minh City and compare prices and foreign-ownership terms on our main site.
Visit Happy Land